Stirling Dam Stage 2 Upgrade

Client: Water Corporation MESB

Stage 2 Upgrade of dam works to facilitate strengthening and re cladding of dam wall, access around site and spillway improvement. The following electrical component

  • Relocation and improvement of existing site electrical services.
  • Associated cabling to distribution, environmental and riparian release valves (flowmeters and turbidity analysers)
  • Installation of new Micro Hydro Generator for instrumentation and SCADA Power Supply. Reconfigure micro-hydro shed to house new inverter and control panel. Replacement of existing 12V to 24V system, inverter control and distribution.
  • Re-configuring of extension spindles to dam outlet valves, re-wiring, testing and commissioning.
  • Installation of new 30m telemetry mast to access site communications above forest canopy.
  • Installation of new site sole purpose of Generator and associated load bank. Battery charging to generator via regulated supply from solar panels.
  • Installation of Site Tunnel Distribution Board, Load balancing of area and tunnel lighting.

 

  • Stirling Dam
  • Stirling Dam3
  • Stirling Dam6
 